Jun Wu. Simulated Analysis on Optimum Scheduling of Outrigger-Brace Connection for Super High-Rise Structure[J]. STEEL CONSTRUCTION(Chinese & English), 2022, 37(1): 46-52. doi: 10.13206/j.gjgS21062901
Citation: Jun Wu. Simulated Analysis on Optimum Scheduling of Outrigger-Brace Connection for Super High-Rise Structure[J]. STEEL CONSTRUCTION(Chinese & English), 2022, 37(1): 46-52. doi: 10.13206/j.gjgS21062901

Simulated Analysis on Optimum Scheduling of Outrigger-Brace Connection for Super High-Rise Structure

doi: 10.13206/j.gjgS21062901
  • Received Date: 2021-06-29
    Available Online: 2022-04-22
  • Super high-rise structure is a hot research issue of large-scale complex structure. Many of its structural systems adopt the hybrid structure system composed of steel structure outer frame tube and reinforced concrete core tube, and are equipped with outrigger truss. Due to the different materials of steel structure outer frame tube and concrete core tube, the vertical deformation during construction is also different. Premature connection of outrigger truss will produce large initial deformation and initial internal force in the truss, and too delayed connection may lead to incomplete structural stiffness and structural safety problems under extreme load conditions.
    In this paper, the 33-34 storey truss and 51-52 storey truss in the South Tower of Yinchuan Lvdi Center were taken as the research objects, and the numerical simulation is carried out by using ANSYS software. In five cases, the effects of different connection time on the internal force and deformation of outrigger truss structure were compared. Through the numerical simulation results, the axial force, stress and deformation curves of the most unfavorable member in five cases were obtained. The analysis results show, the later the connection time is, the smaller the axial force, stress and deformation of truss members are. According to the axial force curves of the outrigger truss, it can be obtained that in the five cases, the maximum axial forces of members No.1, No.2 and No.3 are 340 kN, 1 830 kN and 870 kN, respectively. Under case 4, the maximum axial forces are 90 kN, 400 kN and 120 kN respectively, which are reduced by 73.5%, 78.1% and 86.2%. According to the deformation curve of outrigger truss, the maximum deformations of members No.1, No.2 and No.3 are 9.73 mm, 9.82 mm and 9.98 mm in five cases. Under case 4, the maximum deformations are 3.26 mm, 3.43 mm and 3.27 mm respectively, which is reduced by 66.4%, 65.0% and 67.2%.
    During the construction of the south tower of the twin towers of Yinchuan Lvdi Center, considering the long period of structural shrinkage and creep, it is difficult to form greater lateral stiffness without the connection of the inner and outer tubes with the outrigger truss for a long time. At the same time, considering the construction period and the ability to resist disaster loads, select the case 4 where the truss response is relatively small, that is, the extended truss is connected after the completion of the outer frame tube construction section. During the connection and closure of the upper and lower outrigger trusses, the on-site outrigger truss construction monitoring system was deployed. The data analysis shows that the strain variation of the outrigger truss is in good agreement with the numerical simulation results, which verifies the reliability of the connection timing optimization algorithm proposed in this paper.
  • loading
  • [1]
    王化杰,钱宏亮,范峰,等.超高层结构伸臂桁架安装时序分析与控制方法[J].土木工程学报,2014(7):1-8.
    [2]
    朱骏.超高层建筑钢桁架施工与竖向变形控制技术研究[J].建筑施工,2010,32(4):342-345.
    [3]
    段海,汪晓阳,张希博.超高层建筑伸臂桁架"延迟连接"技术在沈阳恒隆广场主塔楼施工中的应用[J].工业建筑,2014,44(11):141-144.
    [4]
    苑会杰,马锦姝,王泽强,等.超高层结构竖向变形与伸臂桁架安装控制方法研究[J].建筑结构,2018,48(23):65-71.
    [5]
    张风亮,朱武卫,韩大富,等.超高层伸臂桁架不同延迟连接位置终拧方案对比分析[J].施工技术,2017,46(18):74-77.
    [6]
    宁华宏,唐际宇,唐阁威,等.南宁华润中心东写字楼桁架层施工技术[J].施工技术,2018,47(4):25-28.
    [7]
    方义庆,包联进,陈建兴.伸臂桁架对框架-核心筒-伸臂桁架结构侧向受力性能的影响[J].建筑结构学报,2016,37(11):130-137.
    [8]
    周敏.伸臂桁架类加强层对超高层建筑性能影响的研究[D].南昌:南昌大学,2014.
    [9]
    周康.超高层外框-核心筒混合结构健康监测与施工全过程模拟研究[D].长沙:湖南大学,2016.
    [10]
    董传艺,薛瑞,叶泽航.超高层塔楼组合伸臂桁架施工技术[J].施工技术,2017,46(增刊2):192-195.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (307) PDF downloads(27) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return