Volume 37 Issue 12
Dec.  2022
Turn off MathJax
Article Contents
YANG Guosong, ZOU Huanmiao, CUI Qiang. Key Technology of Cross Steel Truss Construction of Supercomputer Cloud Roof[J]. STEEL CONSTRUCTION(Chinese & English), 2022, 37(12): 37-44. doi: 10.13206/j.gjgS22032301
Citation: YANG Guosong, ZOU Huanmiao, CUI Qiang. Key Technology of Cross Steel Truss Construction of Supercomputer Cloud Roof[J]. STEEL CONSTRUCTION(Chinese & English), 2022, 37(12): 37-44. doi: 10.13206/j.gjgS22032301

Key Technology of Cross Steel Truss Construction of Supercomputer Cloud Roof

doi: 10.13206/j.gjgS22032301
  • Received Date: 2022-03-23
    Available Online: 2023-04-20
  • The structure of the Xiongan Supercomputer cloud project is novel in shape, and the spatial relationship is complex. The floor under the roof is split-level, so it is difficult to choose the installation plan and support layout. Therefore, it is necessary to choose a reasonable support unloading sequence to ensure the safety of the structure unloading. The roof steel structure adopted the diagonal cross grid truss structure system, and the truss strings were inclined to each other. The west side of the grid truss extended down in an arc to the sealing beam, and then the roof load was transferred to the lower frame through the curved curved torsion V-shaped support of the variable section. The east side of the grid truss connected with the three-dimensional arch truss, and a small number of round steel pipe strings were arranged in the span to form the long-span spatial structure. The deep design technology was used to optimize the joint design of the long-span structure, so that the bending and twisting V-shaped support processing could meet the demands of the structural force transmission and architectural modeling. According to the structural system and layout characteristics of the project, through the horizontal comparative analysis of the support system, construction difficulty, safety management difficulty, schedule and construction cost of the three schemes, such as lifting scheme, sliding scheme and hoisting scheme, the optimal segmented in-situ hoisting scheme was selected. The east stereoscopic arch truss divided the arch truss into the upper and lower trusses reasonably according to the structure. The next trusses set the support for sectional installation and positioning. At the same time, the next trusses provided the fulcrum to support the previous trusses, which solved the construction problem that the arch trusses are high in height and heavy in weight and difficult to install. The long-span oblique grid truss was divided into reasonable segments, and the multi-span portal support system adopts tower crane to install the roof cross grid truss in segments, and adopted cross stabilizer rod to temporarily fix the structure during the installation process, which solved the construction problem of stability outside the plane during the single piece installation of grid truss and ensures the installation accuracy of the truss structure. The installation sequence of multiple tower cranes advancing from the corner of the roof structure to the core area not only solved the problem that each step of installation can form a temporary stable system to ensure construction safety, but also improved the construction progress through simultaneous installation of multiple cranes, providing a reference for the installation of other long-span truss structures. MIDAS/Gen, a finite element analysis software, was used to calculate the influence of temperature stress on the unloading of long-span cross grid structure. The unloading simulation analysis and comparison of long-span cross truss with different combinations of temperature stress and unloading direction were carried out under multiple working conditions, and the stress-strain nephogram of the maximum stress and maximum deformation of the structure were analyzed. The simulation calculation showed that, the role of temperature stress should be considered in the unloading of multi-fulminated long-span cross truss, and the unloading sequence should be taken from the mid-span support with large deformation. The structural temperature during unloading should be close to that during the installation, so as to reduce the stress caused by the change of structural construction temperature and ensure the safety of structure construction.
  • loading
  • [1]
    江苏沪宁钢机股份有限公司.雄安超算中心钢结构施工组织设计[R].宜兴:江苏沪宁钢机股份有限公司,2021.
    [2]
    李祥,卢彩霞.大跨度钢屋盖网架结构施工关键技术[J].建筑施工,2015(11):1280-1282.
    [3]
    郭小农,杨商飞,罗永峰,等.大跨度屋盖钢结构拆撑过程恒力千斤顶卸载法[J].浙江大学学报(工学版),2014,48(10):1809-1815.
    [4]
    王秀丽,荣子豪,杨本学,等.空间管桁架结构体育馆施工全过程模拟分析与健康监测[J].建筑科学与工程学报,2017,34(2):18-25.
    [5]
    中华人民共和国住房和城乡建设部.钢结构设计标准:GB 50017—2017[S].北京:中国建筑工业出版社,2018.
    [6]
    中华人民共和国住房和城乡建设部.钢结构工程施工规范:GB 50755—2012[S].北京:中国建筑工业出版社,2012.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (164) PDF downloads(12) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return