Hao Yuan, Wenming Hu, Changbiao Huang, Junjie Ma, Ting Pan, Ciwen Heng, Xuelin Bi. Research and Implementation of Construction Plan for Long-Span Steel Corridor in Egyptian CBD Project[J]. STEEL CONSTRUCTION(Chinese & English), 2023, 38(11): 28-34. doi: 10.13206/j.gjgS23021201
Citation: Hao Yuan, Wenming Hu, Changbiao Huang, Junjie Ma, Ting Pan, Ciwen Heng, Xuelin Bi. Research and Implementation of Construction Plan for Long-Span Steel Corridor in Egyptian CBD Project[J]. STEEL CONSTRUCTION(Chinese & English), 2023, 38(11): 28-34. doi: 10.13206/j.gjgS23021201

Research and Implementation of Construction Plan for Long-Span Steel Corridor in Egyptian CBD Project

doi: 10.13206/j.gjgS23021201
  • Received Date: 2023-02-12
    Available Online: 2023-11-27
  • Publish Date: 2023-11-25
  • In recent years, long-span high-altitude conjoined steel structures have been widely used in various complex large-scale public buildings, such as the new headquarters building of CCTV in Beijing, Raffles City in Chongqing, and the Marina Bay Sands Hotel in Singapore, of which the construction methods are very complex and difficult. For the design of the hotel in the Central Business District(CBD) project in the new administrative capital of Egypt, the form of a high-altitude long-span steel structure corridor was also adopted. The steel structure corridor plane is arc type, a total of 2 layers, the height of the first layer is 9.0 m, the height of the second layer is 6.5 m, the maximum span of the outer arc is 43.0 m, the width is 24.0 m. The total weight of the steel structure corridor is about 600 t. According to the characteristic of steel structure corridor, and combined with domestic and foreign long-span high-altitude conjoined steel structures construction methods, two construction hoisting schemes were proposed according to the characteristics of the steel structure corridor. Scheme 1 adopts the method of "segmented hoisting and high-altitude connection". After installation completed on the ground, the fragments are hoisted in a reasonable order and the overall connection is completed in the air. Scheme 2 adopts the method of "high-altitude cantilever bulk installation". The steel truss members are hoisted one by one at the end support position, and are butted together at the mid-span position to form a space truss. Comprehensively considering factors such as construction period requirements, cost requirements, quality requirements, safety requirements, and the ability of local workers, the construction method of Scheme 1 was proposed.
    The construction process simulation method was used to calculate and analyze Scheme 1. The results show that the vertical displacement of the main truss and the component stress ratio are small during the installation of the steel structure, the hoisting sequence is reasonable, and the lateral support is effective, which can meet the requirements of steel component stability and construction precision control during the construction process. The feasibility of the scheme has been verified. At the same time, in order to ensure the safety and quality of the construction process, a number of key control measures have been adopted. Super crawler crane was used to ensure the safety of the hoisting process; temporary supports were set to ensure the stability of components during the construction process; and adjustable tie rods were set to control the levelness of components; it set strict control the daily work time to avoid temperature differences from affecting the installation accuracy, etc.
  • loading
  • [1]
    钟文龙.高空大跨钢结构连廊施工控制关键技术研究与应用[D].合肥:合肥工业大学,2014.
    [2]
    肖建文,余伟华.大跨度超重钢连廊整体提升施工技术[J].钢结构(中英文),2019,34(9):83-86.
    [3]
    莫涛涛.双向大跨钢屋盖网架结构整体提升关键技术研究[J].钢结构(中英文),2019,34(6):78-82.
    [4]
    唐阳明,李咏安.大跨度钢屋盖整体提升施工数值分析及控制研究[J].钢结构,2018,33(9):105-110.
    [5]
    李建.基于BIM的模拟施工技术在钢结构连接桥施工过程中的应用[J].钢结构,2018,33(11):149-153.
    [6]
    张琨.中央电视台新台址主楼结构施工[M].北京:中国建筑工业出版社,2009.
    [7]
    王宏,欧阳超,陈韬.中央电视台新台址CCTV主楼钢结构施工技术[J].施工技术,2006,35(12):54-58.
    [8]
    张昊楠,任志平,张兴志,等.BIM和现实捕捉技术在重庆来福士广场超高层空中连廊数字预拼装中的应用[J].施工技术,2019,48(12):8-11.
    [9]
    程小剑,李玉梅,马维新.重庆来福士广场空中连廊铝板单元整体吊装技术[J].施工技术,2019,48(2):55-58.
    [10]
    牛功科,梁存之,岳国君.重庆来福士观景天桥底部弧形铝板幕墙系统整体提升技术[J].建筑科学,2020,36(3):134-138.
    [11]
    Brian M,Brendon M,Wijaya W.The sands sky park[J].The Arup Journal,2012(1):24-30.
    [12]
    Safdie M.Case study:Marina Bay Sands,Singapore[J].CTBUH Journal,2011(1):12-17.
    [13]
    北京金土木软件技术有限公司.SAP 2000中文版使用指南[M].2版.北京:人民交通出版社,2012.
    [14]
    Ministry of Housing,Utilities and Urban Development of the Arab Republic of Egypt.The Egyptian code of practice for steel construction (LRFD):ECP 205-2015[S].Cairo:Housing and Building National Research Center,2015.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (121) PDF downloads(12) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return