2021 Vol. 36, No. 12
Display Method:
2021, 36(12): 1-8.
doi: 10.13206/j.gjgS21051102
Abstract:
In addition to good thermal insulation performance, polyurethane has certain caking property, tensile, compressive, and shear strength, can effectively restrict the out-plane buckling of the steel plate. At the same time,the cement board is placed on...
In addition to good thermal insulation performance, polyurethane has certain caking property, tensile, compressive, and shear strength, can effectively restrict the out-plane buckling of the steel plate. At the same time,the cement board is placed on...
2021, 36(12): 9-14.
doi: 10.13206/j.gjgS21040602
Abstract:
As a new type of shear wall system, core-grouted assembled thin-walled steel tube-reinforced concrete composite shear wall avoids the difficulty of core pulling of assembly shear wall. Besides, the amount of steel is not increased much, which means i...
As a new type of shear wall system, core-grouted assembled thin-walled steel tube-reinforced concrete composite shear wall avoids the difficulty of core pulling of assembly shear wall. Besides, the amount of steel is not increased much, which means i...
2021, 36(12): 15-22.
doi: 10.13206/j.gjgS20121301
Abstract:
In spatial tubular truss structure, in order to avoid the concentration of weld seams caused by truss chord connections and tubular nodes, the construction method of joint deviation is often used. When segments with different arc curvature exist, joi...
In spatial tubular truss structure, in order to avoid the concentration of weld seams caused by truss chord connections and tubular nodes, the construction method of joint deviation is often used. When segments with different arc curvature exist, joi...
2021, 36(12): 23-31.
doi: 10.13206/j.gjgS21021802
Abstract:
At present,for the connection of steel box beam,its end is usually directly welded to the surface of supporting steel members.This connection method not only has high technical requirements for welding,but also is easy to produce defects at the weld,...
At present,for the connection of steel box beam,its end is usually directly welded to the surface of supporting steel members.This connection method not only has high technical requirements for welding,but also is easy to produce defects at the weld,...
2021, 36(12): 32-43.
doi: 10.13206/j.gjgS21012802
Abstract:
The Exhibition Hall 1 of the Phase I Area B Project of Shaoxing International Convention and Exhibition Center has a rhythmic staggered roof with a non-column span of 72 meters.The design and construction of the steel structure and metal roof system ...
The Exhibition Hall 1 of the Phase I Area B Project of Shaoxing International Convention and Exhibition Center has a rhythmic staggered roof with a non-column span of 72 meters.The design and construction of the steel structure and metal roof system ...
2021, 36(12): 44-72.
doi: 10.13206/j.gjgS21110202
Abstract:
Bolted end plate connections are one of the main joints in prefabricated steel structures and composite structures. They are widely used in multi-story steel frame structures and portal frame steel structures. Bolted end plate connection has the uniq...
Bolted end plate connections are one of the main joints in prefabricated steel structures and composite structures. They are widely used in multi-story steel frame structures and portal frame steel structures. Bolted end plate connection has the uniq...